During Measure Phase the overall performance of the Core Business Process is measured.
There are three important part of Measure Phase.
You collect data from three primary sources: input, process, and output.
For example: The food ordering delivery project team examines 50 deliveries and finds out the following:
This is the method used for measuring results as we proceed through a project. This beginning point enables us to locate the cause and effect of those processes and to seek defect point so that the procedure can be improved.
There are three important part of Measure Phase.
(1) Data Collection Plan and Data Collection
A data collection plan is prepared to collect required data. This plan includes what type of data needs to be collected, what are the sources of data etc., The reason to collect data is to identify areas where current processes need to be improved.You collect data from three primary sources: input, process, and output.
- The input source is where the process is generated.
- Process data refers to tests of efficiency: the time requirements, cost, value, defects or errors, and labor spent on the process.
- Output is a measurement of efficiency.
(2) Data evaluation:
At this stage, collected data is evaluated and sigma is calculated. This gives approximate number of defects.- A Six Sigma defect is defined as anything outside of customer specifications.
- A Six Sigma opportunity is the total quantity of chances for a defect.
Number of defects DPMO = ------------------------------------------- x 1,000,000 Number of Units x Number of opportunitiesAs stated above, here Number for defects is total number of defects found, Number of Units is the number of units produced and number of opportunities means the number of ways to generate defects.
For example: The food ordering delivery project team examines 50 deliveries and finds out the following:
- Delivery is not on time (13)
- Ordered food is not according to the order (3)
- Food is not fresh (0)
13 + 3 DPMO = ----------- x 1,000,000 = 106,666.7 50 x 3According to the Yield to Sigma Conversion Table given below 106,666.7 defects per million opportunities is equivalent to a sigma performance of between 2.7 and 2.8.
This is the method used for measuring results as we proceed through a project. This beginning point enables us to locate the cause and effect of those processes and to seek defect point so that the procedure can be improved.
(3) Failure Mode and Effects Analysis - FMEA:
The final segment of the measure phase is called FMEA. This refers to preventing defects before they occur. The FMEA process usually includes rating possible defects, or failures, in three ways:- The likelihood that something will go wrong.
- The ability to detect a defect.
- The level of severity of the defect.
Yield to Sigma Conversion Table
Yield % | Sigma | Defects Per Million Opportunities | |
99.9997 | 6.00 | 3.4 | |
99.9995 | 5.92 | 5 | |
99.9992 | 5.81 | 8 | |
99.9990 | 5.76 | 10 | |
99.9980 | 5.61 | 20 | |
99.9970 | 5.51 | 30 | |
99.9960 | 5.44 | 40 | |
99.9930 | 5.31 | 70 | |
99.9900 | 5.22 | 100 | |
99.9850 | 5.12 | 150 | |
99.9770 | 5.00 | 230 | |
99.9670 | 4.91 | 330 | |
99.9520 | 4.80 | 480 | |
99.9320 | 4.70 | 680 | |
99.9040 | 4.60 | 960 | |
99.8650 | 4.50 | 1350 | |
99.8140 | 4.40 | 1860 | |
99.7450 | 4.30 | 2550 | |
99.6540 | 4.20 | 3460 | |
99.5340 | 4.10 | 4660 | |
99.3790 | 4.00 | 6210 | |
99.1810 | 3.90 | 8190 | |
98.9300 | 3.80 | 10700 | |
98.6100 | 3.70 | 13900 | |
98.2200 | 3.60 | 17800 | |
97.7300 | 3.50 | 22700 | |
97.1300 | 3.40 | 28700 | |
96.4100 | 3.30 | 35900 | |
95.5400 | 3.20 | 44600 | |
94.5200 | 3.10 | 54800 | |
93.3200 | 3.00 | 66800 | |
91.9200 | 2.90 | 80800 | |
90.3200 | 2.80 | 96800 | |
88.5000 | 2.70 | 115000 | |
86.5000 | 2.60 | 135000 | |
84.2000 | 2.50 | 158000 | |
81.6000 | 2.40 | 184000 | |
78.8000 | 2.30 | 212000 | |
75.8000 | 2.20 | 242000 | |
72.6000 | 2.10 | 274000 | |
69.2000 | 2.00 | 308000 | |
65.6000 | 1.90 | 344000 | |
61.8000 | 1.80 | 382000 | |
58.0000 | 1.70 | 420000 | |
54.0000 | 1.60 | 460000 | |
50.0000 | 1.50 | 500000 | |
46.0000 | 1.40 | 540000 | |
43.0000 | 1.32 | 570000 | |
39.0000 | 1.22 | 610000 | |
35.0000 | 1.11 | 650000 | |
31.0000 | 1.00 | 690000 | |
28.0000 | 0.92 | 720000 | |
25.0000 | 0.83 | 750000 | |
22.0000 | 0.73 | 780000 | |
19.0000 | 0.62 | 810000 | |
16.0000 | 0.51 | 840000 | |
14.0000 | 0.42 | 860000 | |
12.0000 | 0.33 | 880000 | |
10.0000 | 0.22 | 900000 | |
8.0000 | 0.09 | 920000 | Source:http://www.tutorialspoint.com/six_sigma/six_sigma_measure_phase.htm |